CBAM default values: Mozambique
Mozambique has country-specific default values for 24 CBAM products (aluminium). Source: Annex I, Implementing Regulation (EU) 2025/2621.
Values are tCO₂e per tonne of product. “2026” to “2028+” include the mark-up. The estimated cost per tonne uses the 2026 value, the CBAM benchmark for the indicated production route, the 2026 CBAM factor (97.5 %) and the 2026 Q3 certificate price of €82.32. Run your own figures in the cost calculator.
Aluminium
| CN code | Product | Direct | Indirect | Total | 2026 | 2027 | 2028+ | Route | ≈ €/t 2026 |
|---|---|---|---|---|---|---|---|---|---|
| 7601 | Unwrought aluminium | 3.198 | – | 3.198 | 3.518 | 3.838 | 4.157 | K | €175 |
| 7603 | Aluminium powders and flakes | 3.712 | – | 3.712 | 4.083 | 4.454 | 4.825 | K | €215 |
| 7604 10 10 | Bars and rods | 4.124 | – | 4.124 | 4.536 | 4.949 | 5.361 | K | €254 |
| 7604 10 90 | Profiles | 4.161 | – | 4.161 | 4.578 | 4.994 | 5.410 | K | €257 |
| 7604 21 00 | Hollow profiles | 4.161 | – | 4.161 | 4.578 | 4.994 | 5.410 | K | €257 |
| 7604 29 10 | Bars and rods | 4.124 | – | 4.124 | 4.536 | 4.949 | 5.361 | K | €254 |
| 7604 29 90 | Profiles | 4.161 | – | 4.161 | 4.578 | 4.994 | 5.410 | K | €257 |
| 7605 | Aluminium wire | 4.124 | – | 4.124 | 4.536 | 4.949 | 5.361 | K | €254 |
| 7606 | Aluminium plates, sheets and strip, of a thickness exceeding 0,2 mm | 4.986 | – | 4.986 | 5.485 | 5.984 | 6.482 | K | €332 |
| 7607 | Aluminium foil (whether or not printed or backed with paper, paperboard, plastics or similar backing materials) of a thickness (excluding any backing) not exceeding 0,2 mm | 4.986 | – | 4.986 | 5.485 | 5.984 | 6.482 | K | €323 |
| 7608 | Aluminium tubes and pipes | 4.161 | – | 4.161 | 4.578 | 4.994 | 5.410 | K | €257 |
| 7609 00 00 | Aluminium tube or pipe fittings (for example, couplings, elbows, sleeves) | 4.161 | – | 4.161 | 4.578 | 4.994 | 5.410 | K | €257 |
| 7610 10 00 | Doors, windows and their frames and thresholds for doors | 4.161 | – | 4.161 | 4.578 | 4.994 | 5.410 | K | €257 |
| 7610 90 | Other | 4.161 | – | 4.161 | 4.578 | 4.994 | 5.410 | K | €257 |
| 7610 90 10 | Bridges and bridge-sections, towers and lattice masts | 4.161 | – | 4.161 | 4.578 | 4.994 | 5.410 | K | €257 |
| 7610 90 90 | Other | 4.161 | – | 4.161 | 4.578 | 4.994 | 5.410 | K | €257 |
| 7611 00 00 | Aluminium reservoirs, tanks, vats and similar containers, for any material (other than compressed or liquefied gas), of a capacity exceeding 300 litres, whether or not lined or heat-insulated, but not fitted with mechanical or thermal equipment | 4.986 | – | 4.986 | 5.485 | 5.984 | 6.482 | K | €324 |
| 7612 | Aluminium casks, drums, cans, boxes and similar containers (including rigid or collapsible tubular containers), for any material (other than compressed or liquefied gas), of a capacity not exceeding 300 litres, whether or not lined or heat-insulated, but not fitted with mechanical or thermal equipment | 4.986 | – | 4.986 | 5.485 | 5.984 | 6.482 | K | €324 |
| 7613 00 00 | Aluminium containers for compressed or liquefied gas | 4.986 | – | 4.986 | 5.485 | 5.984 | 6.482 | K | €324 |
| 7614 | Stranded wire, cables, plaited bands and the like, of aluminium, not electrically insulated | 4.124 | – | 4.124 | 4.536 | 4.949 | 5.361 | K | €254 |
| 7616 10 00 | Nails, tacks, staples (other than those of heading 8305), screws, bolts, nuts, screw hooks, rivets, cotters, cotter pins, washers and similar articles | 4.986 | – | 4.986 | 5.485 | 5.984 | 6.482 | K | €332 |
| 7616 91 00 | Cloth, grill, netting and fencing, of aluminium wire | 4.986 | – | 4.986 | 5.485 | 5.984 | 6.482 | K | €332 |
| 7616 99 10 | Cast | 3.712 | – | 3.712 | 4.083 | 4.454 | 4.825 | K | €215 |
| 7616 99 90 | Other | 4.986 | – | 4.986 | 5.485 | 5.984 | 6.482 | K | €332 |
Production routes
The route letter decides which CBAM benchmark is used for the free allocation adjustment when default values apply:
- K: primary aluminium
Notes
- Indirect emissions count towards the CBAM obligation only for cement and fertilisers. For iron and steel, aluminium and hydrogen only direct emissions are priced.
- Default values do not need third-party verification. Actual values supplied by the producer must be verified by an accredited verifier.
- The Commission must review the default values by the end of 2027.