CBAM Registerindependent guide

CBAM default values: Montenegro

Montenegro has country-specific default values for 27 CBAM products (aluminium, iron and steel). For 2 further products no value is published, so the “other countries” value applies. Source: Annex I, Implementing Regulation (EU) 2025/2621.

Values are tCO₂e per tonne of product. “2026” to “2028+” include the mark-up. The estimated cost per tonne uses the 2026 value, the CBAM benchmark for the indicated production route, the 2026 CBAM factor (97.5 %) and the 2026 Q3 certificate price of €82.32. Run your own figures in the cost calculator.

Aluminium

CN codeProductDirectIndirectTotal202620272028+Route≈ €/t 2026
7601Unwrought aluminium 1.700–1.7001.8702.0402.210K€40
7603Aluminium powders and flakes 2.050–2.0502.2552.4602.665K€65
7604 10 10Bars and rods 2.280–2.2802.5082.7362.964K€87
7604 10 90Profiles 2.290–2.2902.5192.7482.977K€88
7604 21 00Hollow profiles 2.290–2.2902.5192.7482.977K€88
7604 29 10Bars and rods 2.280–2.2802.5082.7362.964K€87
7604 29 90Profiles 2.290–2.2902.5192.7482.977K€88
7605Aluminium wire 2.280–2.2802.5082.7362.964K€87
7606Aluminium plates, sheets and strip, of a thickness exceeding 0,2 mm 2.730–2.7303.0033.2763.549K€128
7607Aluminium foil (whether or not printed or backed with paper, paperboard, plastics or similar backing materials) of a thickness (excluding any backing) not exceeding 0,2 mm 2.730–2.7303.0033.2763.549K€119
7608Aluminium tubes and pipes 2.290–2.2902.5192.7482.977K€88
7609 00 00Aluminium tube or pipe fittings (for example, couplings, elbows, sleeves) 2.290–2.2902.5192.7482.977K€88
7610 10 00Doors, windows and their frames and thresholds for doors 2.290–2.2902.5192.7482.977K€88
7610 90Other 2.290–2.2902.5192.7482.977K€88
7610 90 10Bridges and bridge-sections, towers and lattice masts 2.290–2.2902.5192.7482.977K€88
7610 90 90Other 2.290–2.2902.5192.7482.977K€88
7611 00 00Aluminium reservoirs, tanks, vats and similar containers, for any material (other than compressed or liquefied gas), of a capacity exceeding 300 litres, whether or not lined or heat-insulated, but not fitted with mechanical or thermal equipment 2.730–2.7303.0033.2763.549K€119
7612Aluminium casks, drums, cans, boxes and similar containers (including rigid or collapsible tubular containers), for any material (other than compressed or liquefied gas), of a capacity not exceeding 300 litres, whether or not lined or heat-insulated, but not fitted with mechanical or thermal equipment 2.730–2.7303.0033.2763.549K€119
7613 00 00Aluminium containers for compressed or liquefied gas 2.730–2.7303.0033.2763.549K€119
7614Stranded wire, cables, plaited bands and the like, of aluminium, not electrically insulated 2.280–2.2802.5082.7362.964K€87
7616 10 00Nails, tacks, staples (other than those of heading 8305), screws, bolts, nuts, screw hooks, rivets, cotters, cotter pins, washers and similar articles 2.730–2.7303.0033.2763.549K€128
7616 91 00Cloth, grill, netting and fencing, of aluminium wire 2.730–2.7303.0033.2763.549K€128
7616 99 10Cast 2.050–2.0502.2552.4602.665K€65
7616 99 90Other 2.730–2.7303.0033.2763.549K€128

Iron and steel

CN codeProductDirectIndirectTotal202620272028+Route≈ €/t 2026
7202 11Ferro-manganese, containing by weight > 2% of carbon 1.690–1.6901.8592.0282.197€44
7202 19Ferro-manganese, containing by weight <= 2% carbon other countries––5.5906.1496.7087.267€397
7202 41Ferro-chromium, containing by weight > 4% of carbon 2.350–2.3502.5852.8203.055€121
7202 49Ferro-chromium, containing by weight <= 4% of carbon other countries––2.8703.1573.4443.731€168
7202 60 00Ferro-nickel 3.480–3.4803.8284.1764.524€123

Production routes

The route letter decides which CBAM benchmark is used for the free allocation adjustment when default values apply:

  • K: primary aluminium

Notes

  • Indirect emissions count towards the CBAM obligation only for cement and fertilisers. For iron and steel, aluminium and hydrogen only direct emissions are priced.
  • Default values do not need third-party verification. Actual values supplied by the producer must be verified by an accredited verifier.
  • The Commission must review the default values by the end of 2027.

All countriesDefault values vs actual emissions