CBAM Registerindependent guide

CBAM default values: Bolivia

Bolivia has country-specific default values for 28 CBAM products (aluminium, cement, hydrogen). For 5 further products no value is published, so the “other countries” value applies. Source: Annex I, Implementing Regulation (EU) 2025/2621.

Values are tCO₂e per tonne of product. “2026” to “2028+” include the mark-up. The estimated cost per tonne uses the 2026 value, the CBAM benchmark for the indicated production route, the 2026 CBAM factor (97.5 %) and the 2026 Q3 certificate price of €82.32. Run your own figures in the cost calculator.

Cement

CN codeProductDirectIndirectTotal202620272028+Route≈ €/t 2026
2507 00 80Calcined clay other countries––0.2800.3080.3360.364€0
2523 10 00White clinker other countries––1.3701.5071.6441.781B€55
2523 10 00Grey clinker 0.8700.0300.9000.9901.0801.170A€28
2523 21 00White Portland cement other countries––1.4501.5951.7401.885€62
2523 29 00Grey Portland cement 0.8700.0600.9301.0231.1161.209€31
2523 90 00White hydraulic cements other countries––1.4901.6391.7881.937B€67
2523 90 00Grey hydraulic cements 0.8300.0600.8900.9791.0681.157A€27
2523 30 00Aluminous cement other countries––2.0302.2332.4362.639€126

Aluminium

CN codeProductDirectIndirectTotal202620272028+Route≈ €/t 2026
7601Unwrought aluminium 0.360–0.3600.3960.4320.468L€25
7603Aluminium powders and flakes 0.470–0.4700.5170.5640.611L€31
7604 10 10Bars and rods 0.690–0.6900.7590.8280.897L€51
7604 10 90Profiles 0.710–0.7100.7810.8520.923L€52
7604 21 00Hollow profiles 0.710–0.7100.7810.8520.923L€52
7604 29 10Bars and rods 0.690–0.6900.7590.8280.897L€51
7604 29 90Profiles 0.710–0.7100.7810.8520.923L€52
7605Aluminium wire 0.690–0.6900.7590.8280.897L€51
7606Aluminium plates, sheets and strip, of a thickness exceeding 0,2 mm 1.150–1.1501.2651.3801.495L€92
7607Aluminium foil (whether or not printed or backed with paper, paperboard, plastics or similar backing materials) of a thickness (excluding any backing) not exceeding 0,2 mm 1.150–1.1501.2651.3801.495L€83
7608Aluminium tubes and pipes 0.710–0.7100.7810.8520.923L€52
7609 00 00Aluminium tube or pipe fittings (for example, couplings, elbows, sleeves) 0.710–0.7100.7810.8520.923L€52
7610 10 00Doors, windows and their frames and thresholds for doors 0.710–0.7100.7810.8520.923L€52
7610 90Other 0.710–0.7100.7810.8520.923L€52
7610 90 10Bridges and bridge-sections, towers and lattice masts 0.710–0.7100.7810.8520.923L€52
7610 90 90Other 0.710–0.7100.7810.8520.923L€52
7611 00 00Aluminium reservoirs, tanks, vats and similar containers, for any material (other than compressed or liquefied gas), of a capacity exceeding 300 litres, whether or not lined or heat-insulated, but not fitted with mechanical or thermal equipment 1.150–1.1501.2651.3801.495L€83
7612Aluminium casks, drums, cans, boxes and similar containers (including rigid or collapsible tubular containers), for any material (other than compressed or liquefied gas), of a capacity not exceeding 300 litres, whether or not lined or heat-insulated, but not fitted with mechanical or thermal equipment 1.150–1.1501.2651.3801.495L€83
7613 00 00Aluminium containers for compressed or liquefied gas 1.150–1.1501.2651.3801.495L€83
7614Stranded wire, cables, plaited bands and the like, of aluminium, not electrically insulated 0.690–0.6900.7590.8280.897L€51
7616 10 00Nails, tacks, staples (other than those of heading 8305), screws, bolts, nuts, screw hooks, rivets, cotters, cotter pins, washers and similar articles 1.150–1.1501.2651.3801.495L€92
7616 91 00Cloth, grill, netting and fencing, of aluminium wire 1.150–1.1501.2651.3801.495L€92
7616 99 10Cast 0.470–0.4700.5170.5640.611L€31
7616 99 90Other 1.150–1.1501.2651.3801.495L€92

Hydrogen

CN codeProductDirectIndirectTotal202620272028+Route≈ €/t 2026
2804 10 00Hydrogen 10.820–10.82011.90212.98414.066€571

Production routes

The route letter decides which CBAM benchmark is used for the free allocation adjustment when default values apply:

  • A: grey clinker / cement
  • L: secondary aluminium

Notes

  • Indirect emissions count towards the CBAM obligation only for cement and fertilisers. For iron and steel, aluminium and hydrogen only direct emissions are priced.
  • Default values do not need third-party verification. Actual values supplied by the producer must be verified by an accredited verifier.
  • The Commission must review the default values by the end of 2027.

All countriesDefault values vs actual emissions